The inspection report and how the visit runs

A factual, illustrated document, delivered within 48 hours of the visit. It describes the property as we found it, so that you decide and negotiate on facts.

What the report contains

The same structure for all three inspections, within their own scope. The sample shown is a Complete Inspection: 63 pages.

Sample: Complete Inspection report
  • A summary up front

    The points found, summarised in a few pages before the detail.

  • Detailed observations

    Every observation is located, photographed and described.

  • Building and services kept apart

    Building defects and faults in the services are presented separately.

  • The readings taken

    Moisture, ventilation flow, temperatures, RCD tests, depending on the inspection.

  • A clear scope

    What was examined, what was not, and why: the inspection is visual and non-destructive.

  • In your language

    English, French or the language of your choice.

Sample observations

Crack measured: 11.4 mm wide
Observation

Crack measured: 11.4 mm wide

Every crack is measured with a caliper, not just photographed. Here, 11.4 mm wide: far more than a render defect. A structural engineer's opinion is advisable before committing.

Crack measured: 83 mm deep
Observation

Crack measured: 83 mm deep

Depth is measured too: 83 mm, well beyond the thickness of the render. The crack reaches the masonry: this measurement is what separates a structural defect from a surface crack.

Rainwater at the foot of the wall
Observation

Rainwater at the foot of the wall

The downpipe stops above an open gully, so roof water pours out at the foot of the wall, where the render turns green and cracks at the corner. Recommendation: connect the downpipe and carry the water away from the foundations.

Drone survey of the roof
Information

Drone survey of the roof

An overview of the roof without climbing onto it. Every detail is then located and inspected close up: chimney stack, roof windows, hips.

Displaced tiles along a hip
Observation

Displaced tiles along a hip

From the drone, several clay tiles appear displaced along the hip, with moss and lichen. Re-laying this area is advisable to prevent leaks.

Leak under the bath
Observation

Leak under the bath

A leak found under the bath, with the access panel open. The bathroom being upstairs, the water threatens the ceiling of the room below: a plumber should be called promptly.

Moisture reading on the slab
Information

Moisture reading on the slab

Moisture meter reading on the slab: 4.2%. Every reading is recorded in the report with its location, to put figures on the condition of the structure rather than rely on the eye.

Radiator tested at 42 °C
Good point

Radiator tested at 42 °C

Heating switched on during the visit: 42 °C measured on the radiator surface with an infrared thermometer. The radiator heats up properly.

01/ 08

How does the inspection run?

Four steps, from first contact to the report in your hands.

  1. 1

    First contact and free quote

    Call us, message us on WhatsApp or fill in the form. Tell us the type of property, its floor area, the town and, if you know it, the year it was built: you receive a free quote within 24 hours, with the inspection we recommend.

    No need to wait for the preliminary contract: we can inspect before an offer, before signing or during the cooling-off period.

  2. 2

    Booking the visit

    Once the quote is accepted, we agree a date together, around your diary and that of the seller or the agent. If your cooling-off period is about to expire, tell us at first contact.

    The right moment: during the ten-day cooling-off period after the compromis de vente is signed, or before the conditions precedent are lifted.

  3. 3

    The inspection on site

    One of our experts examines the property methodically, within the scope of the inspection: 1 to 2 hours for a Systems Inspection, from 2 hours for a Building Inspection, half a day for a Complete Inspection. Every observation is located, photographed and recorded.

    You do not have to be there, but it helps: you can ask your questions on site.

  4. 4

    Your report

    You receive the report as a PDF within 48 hours. It describes the condition of the property as found, observation by observation, with captioned photographs and the readings taken, and opens with a summary. It is written in the language of your choice.

    The report describes; it does not price the works. To estimate their cost, use its observations to obtain quotes from contractors.

After the report

The report does not steer your decision: it gives you what you need to make it.

No significant defect

The report confirms the condition of the property. You sign knowing what you are buying, with a baseline for future maintenance.

Points to address

The documented observations support your discussion with the seller: a price adjustment, works before completion, or quotes to obtain from contractors.

A significant defect

You can seek a specialist's opinion, renegotiate, or withdraw on the terms set out in your preliminary contract.

For withdrawal terms, your notaire remains the person to ask.

Frequently asked questions

Within 48 hours of the visit, as a PDF. It is written in English, French or the language of your choice.

No. The report describes the condition of the property as found; it does not price the works. To estimate their cost, obtain quotes from contractors based on its observations.

No. You can contact us at any point: before viewings, before signing or during the cooling-off period. The earlier the inspection, the more room you keep to renegotiate or withdraw.

No. Unlike the statutory diagnostics (energy rating, asbestos, lead…), an inspection is not a legal requirement in France. It is a voluntary step, standard practice in the UK, Ireland and North America.

The statutory diagnostics check specific regulatory points: energy performance, asbestos or lead… The inspection assesses the general condition and the working order of the property: roof, structure, damp, services. The two are complementary.

Yes. For a flat we examine the inside of the property and the accessible common parts, and we read the minutes of the owners' meetings when you send them to us.

The report is a source of information. During the ten-day cooling-off period you may withdraw without giving a reason. Beyond that, it depends on the terms of your preliminary contract: your notaire will advise you.

Yes. There is no travel fee within 50 km of Toulouse. Beyond that, and anywhere in France, a travel fee is added, depending on the distance.

Ready to know what you are buying?

Get in touch for a free quote. We reply within 24 hours.

Free quoteWhatsApp